Steel Framing

Flip Flop House: Drumroll please……STEEL!

Yesterday (Monday, October 3, 2010 to be exact) was another really exciting day – they began putting the steel framing up!!  (I know, I know – sounds more exciting than a day of no traffic in LA, right?!)

A couple weeks ago, we checked out the steel at the shop where it was fabricated.  In that post, we show the massive quantity of steel that we are using to build this house, and we explain why we chose to use so much metal.

It is very exciting for us because the steel reveals the true shape of the house, and provides the skeleton structure for the other trades to commence their work.  It also signifies that we are moving past the site work (foundation, perimeter walls, etc) – and we can actually start working on the body of the Flip Flop House!

With the framing in place, we are beginning to see the interior spaces in their actual size, and their relationship to the exterior.

The guys started assembling steel around 9:00 am, and by 11:00 am – they had all of this up!

By Friday, all of the steel should be up (which would mean that it took these skilled men one week to assemble it).  Then, they will spend another 2 weeks welding all of the connections, while an inspector makes sure that all the welds are according to code.  All in all, it is a remarkably quick process, considering how much they are getting done!

To show how fast all of the steel comes together, check out the video below.  In just 6 minutes, a beam goes from laying on the ground, to being 10 feet in the air and attached to the other steel members!